The art of signal generation just got better

The art of signal generation just got better

Significantly improved EVM performance!

The art of signal generation just got better with the R&S®SMW200A and R&S®SMM100A vector signal generator evolution.

Testing high-performance devices, demands vector signal generators with superior RF characteristics and excellent signal quality - in particular exceptional EVM performance - for high accuracy in spectral and modulation measurements.

The latest evolution of the industry-leading R&S®SMW200A and R&S®SMM100A transforms signal generation into an art form, with software and hardware updates that offer up to 8dB EVM improvement and simple operation in a new streamlined design, ensuring confidence in your results - and the DUT design decisions you make.

A few highlights:

  • Improved EVM performance in frequency ranges up to 44 GHz (up to 8dB)
  • Built-in RF linearization functionality and a wide frequency range (up to 67GHz)
  • Simple operation - no need for external software

Interested in the finer details? Read on to learn more. Or contact us to discuss your application with our experts.

Meet the masterpieces

The signature: R&S®SMW200A

The R&S®SMW200A vector signal generator evolution is a masterful composition of enhanced EVM performance and superior RF characteristics. Featuring an I/Q modulator and up to 2 GHz RF bandwidth, it generates 5G NR signals with an EVM down to 0.1% and WLAN IEEE802.11be signals with an EVM down to -53 dB, for reliable performance across various applications.

  • Excellent signal quality for high accuracy in spectral and modulation measurements
  • Frequency range from 100 kHz to 3/6/7.5/12.75/ 20/31.8/40/44/56/67 GHz (overrange 72 GHz)
  • Up to 2 GHz RF modulation bandwidth with internal baseband

Informations produits

The best-in-class: R&S®SMM100A

Still the only one in its class with mmWave testing capabilities, the R&S®SMM100A vector signal generator offers excellent RF characteristics across the entire frequency range up to 44GHz. Now with significantly improved EVM performance, it brings even more precision to your signal canvas.

  • at higher output power, with the R&S®SMM-K575 RF linearization option.
  • with SSB phase noise (-139 dBc @ 1GHz) thanks to R&S®SMM-B709 low phase noise option
  • with outstanding modulation characteristics

Informations produits

Key benefits

What's new?

How did the art of signal generation just get better? Our quick explainer video highlights the key benefits of the R&S®SMW200A and R&S®SMM100A evolution.

The art of signal generation
SMW Improved EVM Performance

Introducing the K575 option

What if you need reliable and repeatable EVM performance at higher output levels to understand what is happening in your DUT?

The new K575 RF linearization option delivers significant EVM performance enhancements. For example, for a 100 MHz 5G NR signal in line with the 3GPP TM3.1 at 3.5GHz, and an output power of 10dBm, the K575 option can improve EVM performance by 8dB. This not only offers you greater insights into your device, but also ensures that your critical RF path linearization measurements meet modern test requirements.

Importantly, if you have a R&S®SMW200A or R&S®SMM100A you can benefit from the K575 option without needing to purchase new equipment, minimizing costs while remaining future proof.

Want to learn more about upgrading your current equipment?

Get in touch and one of our experts will take you through the specifics.

Demander des informations

Do you have questions or need additional information? Simply fill out this form and we will get right back to you.
For service/support requests, please go here to log in or register.

Marketing de permission

Votre demande a bien été envoyée ! Nous vous contacterons dans les plus brefs délais.
An error is occurred, please try it again later.